Wednesday, January 06, 2010

How do we live?

Simply, in a word.

No electricity bills - but an overcast week or two limits what appliances can run, especially if one neglects to fill the fuel container for the generator when one is in town! Yes, I did a LOT of jigsaws over the Christmas/New Year break.


For example, one has solar panels - this is a 100 Watt array, consisting of 5 x 20W panels that came (cheaply) as a kit that Dave made a frame for and did all the wiring for.


The solar panels charge a battery - we have a truck battery in this photo, cheaper than the "proper" deep cycle batteries, won't last as long but it'll do for now. Actually, we have two sets of panels and two batteries set up at the moment, another set of 5 panels waiting for Dave to put them together and hook them up. Then we attach an inverter to the battery/ies, run an extension (power) cord into the house, turn the inverter on and run our standard 240volt appliances - will run laptop, stereo, tv, video/dvd player, blender (slowly!), etc. For power-hungry things like the washing machine (twin tub), iron and vacuum we run the big generator (at the top/left of photo) - makes a helluva noise though so we don't tend to use it for frivolities. When the batteries are low, we hook the battery charger up so generator charges them. Needs petrol in the genny though..... Had a little generator 750w but it's in outpatients awaiting attention.


Water? Well, we catch the roof water directly into the squat tank on the northwest corner of the house, then use the pictured fire fighting pump to move the water up a (buried) pipe to the little header tank up the hill, which then gravity feeds back to the house - so we only need to use the pump once every week or so but the rest of the time the water obliges by falling down the hill to our taps with no electrical assistance.

Bought a new camera a while back, and went wandering one frosty morning, testing out the macro/super-macro,etc.

Here's my favourites - looooove frost :) even though it's murder on some of the vegie plants. That is, when I've got vegies growing!










Frost photos from a winter wander

Bought a new camera a while back, and went wandering one frosty morning, testing out the macro/super-macro,etc.

Here's my favourites - looooove frost :) even though it's murder on some of the vegie plants. That is, when I've got vegies growing!

Skip a bit ...

One, two, skip a few, 99, 100!

Well, I have a memory stick with me with some 2009 photos so we're skipping all the intermediary stuff and have fast forwarded to July 2009 and onwards.


Here's the concreters doing the slab for the shed - we bought a kit for a 2-door garage with barn doors (as opposed to roller doors) because we didn't plan to park cars in there.


The blank slab, with the (very envirofriendly, only one tree - that we didn't really want in that spot - died for the purpose) custom-designed clothesline in the background, is going to have the carport kit built on it. Some day.



And here we have Pa (my dad) and Dave putting the shed up. It is a thing of great beauty to my eyes, because it holds lots of stuff!



Shed's all finished now, although the downpipes haven't been set up to run the roof water to the tank yet. With all the rain we've had the tanks have been overflowing so we're not anxious enough to be motivated to hook it up.

Sunday, February 01, 2009

Early December '07 progress

I was planning a bigger update, but forgot to transfer photos from my laptop to the memory stick to bring into town. And starting the laptop means either (1) plugging it into a noisy generator, or (2) attaching the inverter to the battery off the solar panels near the shed up the hill, running an extension cord into the tent (the "study" these days - provides shade so you can actually see the computer screen) and plugging the laptop into the extension cord, or (3) attaching the inverter to the lighter plug in the car and using the laptop while driving to town (while Dave drives, of course). All options require effort and timing. I'll get there ;-)

I'm having a computer-using day at the library today as I rarely get near the internet. When I do though, I zip into the library half an hour or so before closing time to do some urgent money juggling, check email for anything urgent and dash out. School's back now, though, so hopefully I'll not be so pressed for time.

Actually, on second thoughts, I probably will be even more pressed for time because I'm off to enrol in a couple of horticulture courses at Armidale TAFE later this week (neighbours and I are going to share petrol costs - it's 200km round trip) which means I should be at TAFE Monday, Tuesday and Wednesday each week. Should be more fun than that bloody Certificate IV in Business Administration was - that shouldn't be hard though, just about anything is more interesting than being stuck in front of a computer in a small room for a job, bleah.

This morning I've already been to the storage shed and knocked some shelves apart, loaded the back of the ute with boxes and shelf components, and loaded the trailer with furniture (padded with blankets and wrapped in a tarp in case it rains, strapped down with far too many ratchet tie-downs but hey it's better to overdo it than have things fall off!). Amazingly, the storage shed is looking close to half empty. Just need to get the house finished then we can empty it out - will be a couple of weeks-ish yet though.

Well, here's some house photos. I'll have to get some more loaded on my memory stick for another day, because we've done a heckuva lot since these were taken.

That's me on the trestles, finishing off the external Hardiplank cladding on the eastern end of the house. Hmm, taken late November from memory. I don't have a fear of heights, just a fear of having someone else feeding me and wiping my bum for me if I fall and break my arm! There were a couple of times, though, when Dave and I were both on the trestles (two hollow aluminium "planks") that I spoke rather abruptly to Dave - something along the lines of "stand still you bugger before I s**t myself!!" - because he's far less skittish than me and would walk confidently along the plank without realising that I was on the receiving end of the trampoline effect of his weight.

View of the house from the southeast. The trestles are set up on the western gable for me to finish the cladding, verandah cladding almost finished (just the top row to go). Actually, this photo was taken on the 1st of December because I can see the truck that was unloading the internal linings and insulation around on the northern side of the house. We didn't get very much done on the house after this because we had to pack up the rental house - mostly into a rented storage shed - and clean it out. A neighbour from Mount Mitchell who owns a pan-tech truck helped us bring a load out to the new house (including the 50-odd pots with our future orchard in them). And we handed back the keys to the rental house. Just as well - paying nearly $200 week rent PLUS mortgage PLUS fuel to get back and forth to work on the house (90km round trip) meant that we were very glad for the Economic Stimulus bonus money. It ended up being spent largely on takeaway food and petrol.

Apart from finally getting the house to lockup stage, all we did on the internals prior to moving was to get the walls in the main bedroom lined. Actually, we got three walls done, which at least gave us somewhere to stack the mattresses. We slept in the tents for two more nights while we lined the last wall, and we've been moving the beds around and camping in different rooms depending on what room we're working in/on.

This last photo is to give a different perspective of how the house is situated on the 25-acre block. Most of the other photos I've taken are fairly close to the house, and the most noticeable thing in those shots is the sandy soil that was exposed by the earthworks.

But as you can see from this photo, the clearing works can't even be seen if you go for a bit of a walk down the hill. The block of land is on the eastern slope of Mount Mitchell, which is the "locality" of our address. For pureblood townies, a locality describes a general area, far more spread out than a village. In our locality, blocks of 25 acres are the smallest. Our "subdivision", at our end of the road, is mostly 25 acre blocks, but there are 100-acre blocks further up the road, from an earlier land sale.

That'll do me for now, hopefully it won't be over a month before I get to post again.

Wednesday, November 26, 2008

Internals

Quickly (because I'm leaving TAFE soon!) a few shots of the insides.


(1) Hot water system in approximately the right place - a lot more to happen yet before it goes though!
(2) Plumbing roughed in. Bath taps are 100mm too low (oh lordy) but apparently that can be fixed. Ah, apprentices.
(3) Scandia Cuisine, has the pipes inside the wood box to hook up to the hot water system. Free hot water from our 25 acres of trees forever!
(4) Gable ends have no wall sarking or cladding yet, and haven't got the external doors on so the weather (OH the weather!) is still getting in. Top priority before we move in 12 days' time is to at least get the place to lockup!!
(5) View of the western gable from inside the ceiling space. We're putting up some sheets of yellow-tongue flooring so that we can use the roof for storage.

External Walls

I forgot to take photos in the last couple of days so I can't show the latest. I spent Monday and Tuesday nights in the tent, working on the wall cladding. Came home this morning because it rained! And it is STILL raining, and planning to rain even more - and where is the tank that was going to arrive two weeks ago???? Sigh!!
(1) Wall cladding started going up while Dave was working on the roof.
(2) South side, under the verandah. I've got all done now except for the narrow strip just below the wooden wall batten. Fiddly, but I'll get there.
(3) Northern face. I've got done up to the tops of the windows, interesting times ahead there because (for example) the cladding to the left of the sliding door is 7mm lower than the cladding on the right. I'm still brewing about how to get around it...
(4) Not a good shot, but it was raining so much this morning I wasn't going to go for a wander too far out from cover to get a good photo of the wall claddings. Good shot of the old tin tank though. It's supposed to be the header tank. See the "path" straight up behind/beside the tank? At the top of that path there's a clearing in the trees where it will eventually go. The patch of crusher dust to the right of the tank is where the new tank/s will go. Dave got the fire fighting pump serviced so that when the first new tank arrives he can pump the water out of the little tin tank into the new tank, then we can move the little tank up the hill to fulfil its destiny.

Roof

The roof sheets have gone on in stages over a couple of weeks, depending on the weather. OH, the weather!!





(1) The verandah sheets go on.

(2) The first roof sheet goes on.

(3) The first side of the roof finished.

(4) Halfway across the second side ... and the wind got up. Pa insisted that he would drive back from his month at the coast to help us get the rest of the roof sheets on, but we got a really good, still day (and we had learned a lot from working with Pa) so Dave and I got the last lot on all by ourselves - and weren't we happy little campers being able to ring and say "you can sleep easy at night now Pa, we got the last roof sheet on today".

(5) Last sheet goes on!!!!!!!!! What a sense of achievement.

Tuesday, November 25, 2008

Roof trusses going up!

Here's a little retrospective of how it's been going ...
Dave doing the "flying fruit fly" getting the roof trusses stood up. My job was to stand below and push the truss up with a pole while Dave pulled on the rope he'd tied around the truss. Once it was standing he bolted it to a temporary truss spacer - and that's another story in itself! Bit of a waste of time in the end, but that's something you find out the hard way, hmm.
A very happy pair of campers :-)


(1) Wall frames completed.





(2) First roof truss going up.










(3) A few roof trusses up...






(4) Nearly finished ... !








(5) Done!!!!!!!












Sunday, November 16, 2008

Update

It's raining today (and most likely tomorrow) so I'm having a pricing, paying & ordering day. Plus we're having a garage sale on Saturday so I've got to go through cupboards and sort the entire house out.

Three weeks today we hand back the keys to the rented house!

The state of the house today:
  • Roof sheeting is ALL ON! Dave still needs to put in the other half-a-million roofing screws but the sheets are secure enough for the moment. The barge end on the east is trimmed out, but not the west, so that's his next job. Once the western barge is trimmed out the last piece of ridge capping can go on too, and that will be the roof finished ... oh, except for a fiddly little half-circle thingy but he'll get to that eventually!
  • All windows and both external door jambs are in. Need to hang the two external doors.
  • Just over 1/4 of the Hardiplank cladding is on. I've been working on that mostly by myself. Dave's been on the roof with me helping out a fair bit, but when he's just whacking screws in I've been working on the external walls.
  • Plumber and bobcat man came on Fri, drains are done and buried, including septic trench. Pad is done for the tank, which should arrive Thurs or Fri. Pity it hadn't arrived already, this rain is the best we've had in months! I've got a couple of buckets under the downpipes though...
  • Council comes to inspect frame tomorrow arvo.
  • Plumber comes back tomorrow or Wednesday to rough in pipes.
  • Telstra contractor comes on Sunday to connect phone. Telstra switches it on at the exchange on Monday.
  • Next Monday the truck arrives with the plasterboard linings and the insulation.

The plan at the moment is:

  • Complete external wall linings by Monday 21st Nov.
  • Garage sale Sat 23rd Nov.
  • Have internal linings complete by Monday 1st Dec.
  • First week December is mostly moving - need internal ceilings up so that we can store a million boxes in the roof cavity while we finish off the inside of the house!

There is so much to do it is overwhelming. For example, I haven't worked in two weeks because I don't have time - thankfully my new boss isn't stressed, she's happy to plug along for a couple more weeks until things settle down a bit.

I'll post some photos ... one day!

Tuesday, October 14, 2008

Walls







Mr Y and I met the PAAL semi-trailer at Glencoe at 6.20 am last Wed 8/10, it followed us out to the block and unloaded. Truck was gone by 8.30am. Mr Y and I spent a couple of hours storing the windows, doors, etc under cover, then started laying out the wall frames in the order they needed to be assembled.
My dad (Pa to the grandkids, so I’ll call him Pa here) arrived just before midday, helped us finish laying out the wall frames, had lunch and then we got into it!







End of the Day 1 (Wed) we had the wall frames up for two rooms.



Day 2 (Thurs) we had the wall frames up for all but the big open lounge/dining/kitchen area.



Day 3 (Fri) we finished getting all the wall frames up and got the external walls all squared at floor level and dynabolted to the slab.



Day 4 (Sat) Mr Y finished squaring up all the internal wall frames and dynabolted them to the slab while I started assembling and bolting together the roof trusses. It rained at 1pm so we quit for the day. (It turns out it was the only shower all day according to the neighbours, but Littlemiss was with us and she wasn’t at her best so an early day was good for her.)




Day 5 (Sun) Mr Y had work so Pa, Littlemiss and I headed out, we got 2 hours in before it absolutely p-p-p-poured down. Before it rained, I discovered that we had been sent an incorrect bracing pack which slowed down the roof truss assembly.


Having Pa there has doubled our working speed, because he is the extra hand that holds things steady for one person while the other gets on with another job. Bloody brilliant. He’s got a dodgy knee, arthritis and a touch of gout so if something needs doing at floor level he’s happy to let one of us bend down!


Monday Mr Y and I both had work, yesterday I worked and Mr Y wrangled the demanding child (!) and cooked dinner, today it’s just as well we’re not out there because the weather is wet again.


Hopefully the replacement parts will turn up by courier today and the weather will be better (will check BoM shortly) and we’ll get back into it tomorrow. Need to plumb, square and brace the wall frames, and insert hundreds of tiny screws before we start putting the roof trusses up anyway, so we really just need a dry day to knock some of that fiddly stuff over.
So far, going well.

Saturday, August 23, 2008

New chookhouses; shed progress

I took these photos last month.

The new chookie housing will be in a long poly tunnel clad in chicken wire to about 1800mm high, than hail netting over the top. Here's hoping the foxes won't get past the kelpie to figure out that the hail netting isn't as strong as it looks.

First photo is of the first "polyarch" with Dave holding it up to about where it's meant to go.









Second photo of the measuring process. It's not vital that everything is perfectly square, but the closer it is, the better the wire will go on.














Third photo of progress just before dark. I had to wait for Dave's help to get the poly pipe threaded right over the star pickets properly, so they look a bit odd here, especially the curly one that I just couldn't get to thread over the second post. It came good in the end, but by then it was too dark to take a photo.

Next steps:
* make a door frame at each end plus on the internal dividing "walls"
* hang the doors, make a wall out of chicken wire from door frame to polypipe hoop, for ends and internal dividers
* dig in a row of vertical sheets of recycled roofing iron at the base of the uphill side and attach them to the polypipe frame
* add a run of chicken wire above the roofing iron
* attach a couple of runs of chicken wire to the base of the downhill side
* stretch hail nettting over the top, attach to chicken wire on both sides
* move out to the block, bringing chooks to their new home!

Last photo - Dave working on the shed roof. He was planning to go out to the block today to work on it, but a neighbour from out there dropped in this morning, said it was snowing as she went home late last night, and it was blowing a gale when she left this morning.

We need the shed set up and catching water in the old tin tank, so that we don't have to cart drinking water with us every time we go out there to work on the house.

Tuesday, July 08, 2008

The Old Chook Tunnels

My first chookhouse consisted of a tall fence built around the old dunny. The fenceposts were old hardwood framing timbers out of the cottage I was pulling down, 700mm in the ground, 2m above ground. I bought some cheap 1.8m / 6ft netting that I attached to the posts, leaving a "skirt" of about 300mm / 1ft extending onto the ground outside the yard, as a deterrent for digging predators (i.e. foxes and/or dogs). On the recommendation of the friends who were helping with the construction, who had extensive experience with chooks and foxes, we left the top of the wire loose and a bit floppy to reduce the confidence of climbing predators.

It worked well, but had to go eventually because it turned out the chooks were taking up the best spot to build a house.

Pic #1: CH1 (left) and CH2 (right) in the frost.

Second chookhouses were the original polypipe tunnels. I had seen similar constructions: one was made of about 1" polypipe, 1.5m/5ft wide, and was an aviary for small birds; the second was made of 2" polypipe, 6m/20ft wide and totally covered in wire as a vegie garden that was designed to keep the parrots (and other large birds) out.

Pic #2: CH1 and CH2 in the summer.


CH1, on the left, was my first wonderful polypipe creation. I whacked pairs star pickets into the ground 3m apart and threaded a 7m length of 2" polypipe over them. I made 6 polyarches* in a row and completely covered them in chicken wire. I used new, galvanised, thick, good quality chicken wire for the first round at ground level. I left a 300mm/1ft skirt of wire on the ground outside the CH on one long side, dug bricks into the ground before I started attaching recycled roofing iron on the tinned-in end, and plonked big rocks around the other edges. I used the recycled, cheaper, lighter netting to fill the gap over the top. The predator prevention project succeeded. I saw several foxes in the 5 years I lived there, twice I saw digging efforts that were thwarted by the digger finding the buried chicken wire, and the chookies were safe and happy.

*My own definition of a polyarch: an arch made of polypipe, in this case the ends of the polypipe are threaded over 2 star pickets.

Pic #3: CH2 in the early spring.

The second chookhouse I built was, by necessity, shorter, so I made it a little wider in an attempt to maintain a similar area. As you can see in Pic#3 there were only 5 polyarches, but the pairs of star pickets were 4m/10ft apart. From memory CH1 was just over 11m long, CH2 was around 8m long. This puts the polyarches at around 2m apart.

Because in both chookhouses the polypipe tended to sag, possibly due to the weight of the chicken wire, possibly because that's the nature of polypipe, I used lengths of wood as temporary props under some of the polyarches. Also, when I was attaching the chicken wire to the tops of the polyarches, the combined effect of the weight of the wire plus me tugging on it meant that the end arches pulled in towards the middle of the tunnel. I discovered this phenomenon during the construction of CH1 and used lengths of metal (strapping or RHS? ... can't remember) attached to the apex of the polyarches along the length of the tunnel. When I was making CH2 I attached the bracing prior to doing the top runs of chicken wire, which made the process a lot easier.

Pic #4 CH1 in snow - showing apex bracing and wooden props

CH2 was finished, except for the door end, for a long time. I couldn't "tin it in" like I did with CH1 because the polyarches were wider, and I couldn't reach the middle top to attach the tin. I only just managed it with CH1 being as small as it was. I ended up reusing an old metal door horizontally (that had been left by a previous owner of the block), and other recycled materials including odd bits of chicken wire. I made a wee little housie inside CH2 from an old cast iron kids' bed frame, with recycled hardwood bolted on for perches, old doors for sides and roof wired onto the frame, a daggy sixties sideboard upside down with its legs and doors removed (nailed to a railway sleeper base) for nesting boxes, and a stray bit of roofing iron over the nesting boxes for weather protection.

Pic #5 Asparagus Alley between the CHs
- asparagus is the fuzzy green above/behind the grey-green foliage of the brussels sprouts on the left; whitecurrant bush at bottom right.

Then, of course, there was the wonderful space created between the boundary fence and CH1, which became Rhubarb Alley (see previous post in this blog), and the space between the two tunnels, which was a brilliant spot for asparagus. Asparagus plants love lots of fertiliser, so being slightly downhill from CH2 meant that when it rained the goodies washed straight onto the asparagus. I regularly gave the chooks weeds, kitchen scraps and lawnmower clippings, so after it had been scratched over and manured by the chooks it was the best fertiliser. I'm planning to do something similar in the new chook runs - but that's another story!